Advanced Search
Search Results
15 total results found
Starlink Restaurant Removal Procedures
Pre-requisites · The official Starlink app (available for Android or iOS) · Roof Access – This can be simple as climbing an existing ladder or it could be difficult to access the roof due to other circumstances (Mall site, shared roof with ot...
Starlink Restaurant Installation Procedures
Pre-requisites You will need several things to complete the installation of the Starlink unit and connection to the stores network: · The Starlink unit including the Dish w/mount, Power supply, and 3 cables. (Shipped to site ahead of time in a large ...
CMGIT Network Equipment Installation Guide
CMGIT Network Equipment Installation Guide The installation should be done as early as possible to complete the installation before the site opens. Some sites open at 10AM, most sites open by 10:45 am. Notify the site manager or get permission to start ...
Kiosk Install with Wall Mount and POE Adapter
Preparation - Wall mount 1. Wall Mount. 2. Remove Top Screws only 3. Bottom screws must be loose 4. Notch indicates Top Position Prepartion - Wall mount plate 5: Separate wall mount plate by removing 4 screws ...
Video Links - Kiosk Installation
How to Video Guides #1 Elo Kiosk unboxing & Firmware updatehttps://urltech.net/kiosk-unboxing-firmware #2 Elo Kiosk Desktop Stand Assemblyhttps://urltech.net/kiosk-stand-assembly #3 How to mount Elo kiosk with a Wall-mount brackethttps://urltech.net/kiosk-w...
Templates SO
Template SO KIOSK w POE Adapter Wallmount 22" AIO Android Touchscreen Terminal - LJS 204149 POE MODULE PWR/ENET ADAPT KIT - LJS 204144 VESA Wall Mount with Bracket for Ingenico and Storm Device Holder - LJS 204156 ...
Kiosks Location
Kiosks Location
Wallmount Kiosk Example
28"-36" inches highAn ADA compliant sales or service counter must have a portion that is 28"-36" inches high, measured from the finish floor to the sales counter top. This portion of the counter must also be at least 36" inches long for a parallel approach o...
Adjusting logged time
Adjusting logged time on the website To adjust time already logged on a work order or add additional time follow the steps listed below. Please note that while time logs can be adjusted, your timeliness is measured by the first time you checked in to a work ...
Kronos Login
Step 1: Step 2: Step 3: Step 4: Step 5:
Ergotron Radical Arm Installation
Tools Needed(Hex nut set, 1/4 drill bit for metal, (Stepped Up Bits optional) Old Stainless Steel Elephant Trunk ArmRemove this old stainless steel elephant trunk arm from the wall. Tech will need to use thestainless box that is attached to the wall for...
IT Equipment Removal
IMPORTANT! All shipping details are provided in the “Confidential Information” section of your work order.Note the box should never weigh more than 50 lbs.All items on the list can fit into one 18x18x18 or 20x20x20 box. All items except for the Zebra TC52 req...
Power Cable
New Power Cable POS Side Monitor Side
Where and How!
Network Cabinet(Use any available port between 1-24 on the switch) Wiring CC Pin pads - Back of the CC pin pad(Pin pad numbers must match with store number) Kiosk Numbers - Back of the monitor(Support will need these numbers to update the kiosks) ...
Cash Drawer Installation
Open Cash Drawer Remove Pull up to remove Flip over and remove 6 screws(One screw in each corner) 1 middle bottom 1 middle topRemoved screws Pull up from one side Use 4x self taping screws to mount.3/4" screws to fasten it under th...